Tra Vinh V1-3

In Service

Description

tra vinh v1-3 is an operational fixed windfarm (ID: 550983), in vietnam. It's currently in in service status, and has a total area of 12.02 sq.km. Click to see project specifications and current activity.

WTG Locations
Geotech/Geophys

Work Progress

Asset Information

Operator *****
Country Vietnam
Type *****
Wind Farm Capacity (MW) *****
Area (sq. km) 0
Distance to shore (m) *****
Status In Service

Cables and Substations

Export Cable Length (KM)
Array Cable Length (KM)
No. of substations

Contractors

BOP/EPIC contractor
Turbine installation contractor
Turbine OEM
Foundation EPIC contractor
Foundation installation contractor
Export cable EPIC contractor
Export cable installation contractor
Array cable EPICcontractor
Array cable installation contractor
Substation jacket installation contractor
Substation topside installation contractor
  • OffshoreLinks™
  • Activity

  • Affiliated projects

  • Vessels

  • Logistics

  • News

Turbine Installation Analysis

Turbine Installation Curves

Platforms

Turbines

Sediment Data

Vessel activity BETA

Vessel Activity (time at site) BETA

Upgrade to unlock