SUNNY BRIGHT was last seen in
unknown location
in
Taiwan
as reported by its AIS signal
30 minutes ago.
The asset was last reported to be in
"Moored"
status.
Description
SUNNY BRIGHT
(IMO: 9668520 /
MMSI: 416254700)
is a Survey Vessel,
with length (LOA) 53 meters
meters and width (Breadth) 13 meters.