West Gemini was last seen in
unknown location
as reported by its AIS signal
2 days, 1 hour, 15 minutes ago.
The asset was last reported to be in
status.
Description
West Gemini
(IMO: 9459931 /
MMSI: 354982000)
is a Drillship vessel,
with length (LOA) meters
and width (Breadth) meters.